J. C. Baldwin Construction Company - general engineering contractors for geotechnical engineering and construction, coastal hydrology and hydraulics engineering, coastal bluff stabilization, landslide and earthquake stabilization, and erosion control.
J. C. Baldwin Construction Company - general engineering contractors for geotechnical engineering and construction, coastal hydrology and hydraulics engineering, coastal bluff stabilization, landslide and earthquake stabilization, and erosion control.   J.C. Baldwin home page
  Contact Information for the J.C. Baldwin Construction Company
J. C. Baldwin Construction Company - general engineering contractors for geotechnical engineering and construction, coastal hydrology and hydraulics engineering, coastal bluff stabilization, landslide and earthquake stabilization, and erosion control. J. C. Baldwin Construction Company - general engineering contractors for geotechnical engineering and construction, coastal hydrology and hydraulics engineering, coastal bluff stabilization, landslide and earthquake stabilization, and erosion control. Send e-mail to the J.C. Baldwin Construction Company
Coastal bluff stabilization using Geogrid, tiebacks, epoxy rebar, soil nails, and shotcrete. Retaining wall and erosion control for coastal bluff stabilization.
About the JC Baldwin Construction Company
Client List for JC Baldwin Construction
Construction Project Profiles from JC Baldwin Construction
Construction Awards and Commendations for JC Baldwin Construction
In The News - JC Baldwin Construction
Frequently Asked Questions about JC Baldwin Construction

CLIENT:
Woodward Clyde Consultants
 
JOB FEATURES:
• Rip Rap
• Excavation
• Epoxy Rebar
• Structural Concrete
• Geogrid
• Slope Stabilization
 
Seawall Construction
Cardiff Reef Seawall
Cardiff, California

 
The Cardiff Reef Seawall located at Cardiff State Beach in Southern California was constructed to save homes which were critically threatened by cliff erosion.
 
OUR MISSION
J.C. Baldwin Construction (JCB), with engineering by Woodward Clyde Consultants, pioneered a 7,000-cubic-yard, Tensar-reinforced slope above its 160-foot-long by 27-foot-high seawall and bluff stabilization at Cardiff State Beach. The cast-in-place, reinforced-concrete seawall, accomplished between tides in both confined and fragile bluff space, is supported by a continuous footing into four feet of bedrock.
 
With JCB's innovation and collaboration on the design for the seawall from Woodward Clyde Consultants, the Cardiff Seawall Project eliminated homeowners' fear of being threatened by cliff erosion. The project resulted in both stability and security for the future.
 
    next project  
 

JC Baldwin Construction Company
2469 Impala Drive • Carlsbad, CA 92010
760-438-9275  •  fax 760-438-4963

jcbinc@pacbell.net
 
Home  •   About Us  •   Client List  •   Project Profiles  •   Awards  •   In The News  •   FAQs  •   Contact Us