J. C. Baldwin Construction Company - general engineering contractors for geotechnical engineering and construction, coastal hydrology and hydraulics engineering, coastal bluff stabilization, landslide and earthquake stabilization, and erosion control. J. C. Baldwin Construction Company - general engineering contractors for geotechnical engineering and construction, coastal hydrology and hydraulics engineering, coastal bluff stabilization, landslide and earthquake stabilization, and erosion control. Send e-mail to the J.C. Baldwin Construction Company
Coastal bluff stabilization using Geogrid, tiebacks, epoxy rebar, soil nails, and shotcrete. Retaining wall and erosion control for coastal bluff stabilization.
About the JC Baldwin Construction Company
Client List for JC Baldwin Construction
Construction Project Profiles from JC Baldwin Construction
Construction Awards and Commendations for JC Baldwin Construction
In The News - JC Baldwin Construction
Frequently Asked Questions about JC Baldwin Construction

CLIENT:
Del Mar Beach Club
Homeowners Association
 
JOB FEATURES:
• Caissons
• Grade Beams
• Cast-in-Place Concrete
• Rip Rap
• Hardscape Replacement
 
Upper Bluff Stabilization
Del Mar Beach Club
Del Mar, California

 
The Del Mar Beach Club Upper Stabilization Project required 60 18-inch-diameter and 50-foot deep drilled, cast-in-place piers and grade beams, with a reinforced concrete retaining wall. Access was limited by tides and a near-vertical, 70-foot cliff.
 
OUR MISSION
J.C. Baldwin Construction (JCB) was retained as the general engineering contractor to stabilize the bluff below the exclusive beach front community. The 50-foot deep drilled piers were installed just inches away from the existing buildings. This was done by connecting grade beams and caissons to shore up the three-story condominiums on the bluff.
 
In addition, JCB finished the Del Mar Beach Club Upper Stabilization project on time and on budget. The results of the project are outstanding and will save the Beach Club Condominiums from future complications in bluff failure.
 
    next project  
 

JC Baldwin Construction Company
2469 Impala Drive • Carlsbad, CA 92010
760-438-9275  •  fax 760-438-4963

jcbinc@pacbell.net
 
Home  •   About Us  •   Client List  •   Project Profiles  •   Awards  •   In The News  •   FAQs  •   Contact Us