J. C. Baldwin Construction Company - general engineering contractors for geotechnical engineering and construction, coastal hydrology and hydraulics engineering, coastal bluff stabilization, landslide and earthquake stabilization, and erosion control.
J. C. Baldwin Construction Company - general engineering contractors for geotechnical engineering and construction, coastal hydrology and hydraulics engineering, coastal bluff stabilization, landslide and earthquake stabilization, and erosion control.   J.C. Baldwin home page
  Contact Information for the J.C. Baldwin Construction Company
J. C. Baldwin Construction Company - general engineering contractors for geotechnical engineering and construction, coastal hydrology and hydraulics engineering, coastal bluff stabilization, landslide and earthquake stabilization, and erosion control. J. C. Baldwin Construction Company - general engineering contractors for geotechnical engineering and construction, coastal hydrology and hydraulics engineering, coastal bluff stabilization, landslide and earthquake stabilization, and erosion control. Send e-mail to the J.C. Baldwin Construction Company
Coastal bluff stabilization using Geogrid, tiebacks, epoxy rebar, soil nails, and shotcrete. Retaining wall and erosion control for coastal bluff stabilization.
About the JC Baldwin Construction Company
Client List for JC Baldwin Construction
Construction Project Profiles from JC Baldwin Construction
Construction Awards and Commendations for JC Baldwin Construction
In The News - JC Baldwin Construction
Frequently Asked Questions about JC Baldwin Construction

CLIENT:
City of San Diego
Water Utilities Department
 
JOB FEATURES:
• Rip Rap
• Tiebacks
• Shot Crete
• Geogrid Slopes
• Reinforced Earth Walls
• Sculptured Rockscape
 
Shoreline Protection
Point Loma Treatment Plant
San Diego, California

 
The Point Loma Wastewater Treatment Plant (PLWTP), owned and operated by the City of San Diego, has been experiencing ongoing coastal erosion since its original construction in 1963.
 
OUR MISSION
By 1984, stone revetments had been placed at the base of approximately 50 percent of the bluffs supporting the site facilities. The City recognized that as erosion continued to encroach upon improvements at the PLWTP, it had become necessary to upgrade the coastal protection in the vicinity of the PLWTP to mitigate any further erosion and disruption caused by wave damage. J.C. Baldwin was retained as the general engineering contractor to provide construction for the coastal protective works ultimately proposed for shoreline stabilization in the vicinity of the PLWTP.
 
This project included 125, 90' tiebacks, a 150'-long reinforced earth wall and approximately 1,000 yards of 5,000 PSI decorative Shot Crete carved and colored to match the existing coastal bluffs.
 
Following construction, the PLWTP was awarded the Outstanding Project Award from the California Geotechnical Engineers Association (CGEA), and the Outstanding Civil Engineering Project Award from the San Diego Section of ASCE.
 
    next project  
 

JC Baldwin Construction Company
2469 Impala Drive • Carlsbad, CA 92010
760-438-9275  •  fax 760-438-4963

jcbinc@pacbell.net
 
Home  •   About Us  •   Client List  •   Project Profiles  •   Awards  •   In The News  •   FAQs  •   Contact Us
 

Website design by Orangeport Studios