Point Loma Treatment Plant San Diego, California The Point Loma Wastewater Treatment Plant (PLWTP), owned and operated by the City of San Diego, has been experiencing ongoing coastal erosion since its original construction in 1963. OUR MISSION By 1984, stone revetments had been placed at the base of approximately 50 percent of the bluffs supporting the site facilities. The City recognized that as erosion continued to encroach upon improvements at the PLWTP, it had become necessary to upgrade the coastal protection in the vicinity of the PLWTP to mitigate any further erosion and disruption caused by wave damage. J.C. Baldwin was retained as the general engineering contractor to provide construction for the coastal protective works ultimately proposed for shoreline stabilization in the vicinity of the PLWTP. This project included 125, 90' tiebacks, a 150'-long reinforced earth wall and approximately 1,000 yards of 5,000 PSI decorative Shot Crete carved and colored to match the existing coastal bluffs. Following construction, the PLWTP was awarded the Outstanding Project Award from the California Geotechnical Engineers Association (CGEA), and the Outstanding Civil Engineering Project Award from the San Diego Section of ASCE. next project |
||||||||
JC Baldwin Construction Company 2469 Impala Drive Carlsbad, CA 92010 760-438-9275 fax 760-438-4963 jcbinc@pacbell.net Home About Us Client List Project Profiles Awards In The News FAQs Contact Us Copyright © 2008, J.C. Baldwin Construction Co. All rights reserved. |
|||||||||