J. C. Baldwin Construction Company - general engineering contractors for geotechnical engineering and construction, coastal hydrology and hydraulics engineering, coastal bluff stabilization, landslide and earthquake stabilization, and erosion control.
J. C. Baldwin Construction Company - general engineering contractors for geotechnical engineering and construction, coastal hydrology and hydraulics engineering, coastal bluff stabilization, landslide and earthquake stabilization, and erosion control.   J.C. Baldwin home page
  Contact Information for the J.C. Baldwin Construction Company
J. C. Baldwin Construction Company - general engineering contractors for geotechnical engineering and construction, coastal hydrology and hydraulics engineering, coastal bluff stabilization, landslide and earthquake stabilization, and erosion control. J. C. Baldwin Construction Company - general engineering contractors for geotechnical engineering and construction, coastal hydrology and hydraulics engineering, coastal bluff stabilization, landslide and earthquake stabilization, and erosion control. Send e-mail to the J.C. Baldwin Construction Company
Coastal bluff stabilization using Geogrid, tiebacks, epoxy rebar, soil nails, and shotcrete. Retaining wall and erosion control for coastal bluff stabilization.
About the JC Baldwin Construction Company
Client List for JC Baldwin Construction
Construction Project Profiles from JC Baldwin Construction
Construction Awards and Commendations for JC Baldwin Construction
In The News - JC Baldwin Construction
Frequently Asked Questions about JC Baldwin Construction

Earthquake Damage Reconstruction
King Harbor Mole "B"
Redondo Beach, California

 
The King Harbor Mole "B" Earthquake Damage Reconstruction Project, owned and operated by the City of Redondo Beach, experienced "liquefaction" and severe settlements during the January 17, 1994 Northridge earthquake.
 
OUR MISSION
J.C. Baldwin Construction (JCB) was retained as the general engineering contractor to provide construction which includes demolition; soil pressure grouting and vibrocompaction with stone columns; demolition and reconstruction of damaged utilities and sewer pump station; demolition of existing failed restroom and shower buildings; reconstruction of an existing failed seawall; and construction of a new paved parking lot with curbs, gutters, and drainage facilities. A new boater's lounge and shower facilities was also constructed.
 
During construction of the King Harbor Mole "B" Project, JCB maintained and provided both temporary restroom and laundry facilities. In addition, JCB provided temporary floating access docks installed to the permanent docks in the marina. This enabled the boaters to access their boat slips and permitted usage of facilities during the project.
 
Following completion, this project was awarded the Outstanding Project Award from the California Geotechnical Engineers Association (CGEA).
 
    next project  
 

JC Baldwin Construction Company
2469 Impala Drive • Carlsbad, CA 92010
760-438-9275  •  fax 760-438-4963

jcbinc@pacbell.net
 
Home  •   About Us  •   Client List  •   Project Profiles  •   Awards  •   In The News  •   FAQs  •   Contact Us