J. C. Baldwin Construction Company - general engineering contractors for geotechnical engineering and construction, coastal hydrology and hydraulics engineering, coastal bluff stabilization, landslide and earthquake stabilization, and erosion control.
J. C. Baldwin Construction Company - general engineering contractors for geotechnical engineering and construction, coastal hydrology and hydraulics engineering, coastal bluff stabilization, landslide and earthquake stabilization, and erosion control.   J.C. Baldwin home page
  Contact Information for the J.C. Baldwin Construction Company
J. C. Baldwin Construction Company - general engineering contractors for geotechnical engineering and construction, coastal hydrology and hydraulics engineering, coastal bluff stabilization, landslide and earthquake stabilization, and erosion control. J. C. Baldwin Construction Company - general engineering contractors for geotechnical engineering and construction, coastal hydrology and hydraulics engineering, coastal bluff stabilization, landslide and earthquake stabilization, and erosion control. Send e-mail to the J.C. Baldwin Construction Company
Coastal bluff stabilization using Geogrid, tiebacks, epoxy rebar, soil nails, and shotcrete. Retaining wall and erosion control for coastal bluff stabilization.
About the JC Baldwin Construction Company
Client List for JC Baldwin Construction
Construction Project Profiles from JC Baldwin Construction
Construction Awards and Commendations for JC Baldwin Construction
In The News - JC Baldwin Construction
Frequently Asked Questions about JC Baldwin Construction

CLIENT:
City of San Clemente
Public Works Department
 
JOB FEATURES:
• Demolition
• Tiebacks
• Soil Nails
• Epoxy Rebar
• Shot Crete
• Geogrid Slopes
 
Bluff Stabilization
Colony Cove
San Clemente, California

 
The Colony Cove Bluff Stabilization project consisted of stabilizing the coastal bluff failure that is located at the northwesterly end of Pacific Coast Highway in San Clemente.
 
OUR MISSION
J.C. Baldwin Construction (JCB) was retained as the general engineering contractor with the City of San Clemente to provide installation of 189 95'- long tiebacks, 316 19'-24'- long soil nails, as well as construction of an 80' tall x 850' long concrete wall. The 80-foot-tall project at the Colony Cove location was completed on time and on budget under very difficult site conditions. JCB worked within one foot of the homes located directly above. In addition, JCB was responsible for keeping the traffic flow on Pacific Coast Highway in full operation during the entire project. The Colony Cove Bluff Stabilization project was completed in October 1996. Following completion, JCB received much acclaim for the natural aesthetic rock formation finish on the wall. In addition, the City of San Clemente honored JCB with an award for outstanding service and excellence in construction.
 
    next project  
 

JC Baldwin Construction Company
2469 Impala Drive • Carlsbad, CA 92010
760-438-9275  •  fax 760-438-4963

jcbinc@pacbell.net
 
Home  •   About Us  •   Client List  •   Project Profiles  •   Awards  •   In The News  •   FAQs  •   Contact Us