J. C. Baldwin Construction Company - general engineering contractors for geotechnical engineering and construction, coastal hydrology and hydraulics engineering, coastal bluff stabilization, landslide and earthquake stabilization, and erosion control.
J. C. Baldwin Construction Company - general engineering contractors for geotechnical engineering and construction, coastal hydrology and hydraulics engineering, coastal bluff stabilization, landslide and earthquake stabilization, and erosion control.   J.C. Baldwin home page
  Contact Information for the J.C. Baldwin Construction Company
J. C. Baldwin Construction Company - general engineering contractors for geotechnical engineering and construction, coastal hydrology and hydraulics engineering, coastal bluff stabilization, landslide and earthquake stabilization, and erosion control. J. C. Baldwin Construction Company - general engineering contractors for geotechnical engineering and construction, coastal hydrology and hydraulics engineering, coastal bluff stabilization, landslide and earthquake stabilization, and erosion control. Send e-mail to the J.C. Baldwin Construction Company
Coastal bluff stabilization using Geogrid, tiebacks, epoxy rebar, soil nails, and shotcrete. Retaining wall and erosion control for coastal bluff stabilization.
About the JC Baldwin Construction Company
Client List for JC Baldwin Construction
Construction Project Profiles from JC Baldwin Construction
Construction Awards and Commendations for JC Baldwin Construction
In The News - JC Baldwin Construction
Frequently Asked Questions about JC Baldwin Construction

CLIENT:
TerraCosta Consultants
 
JOB FEATURES:
• Excavation
• Tiebacks
• Shot Crete
• Sculptured Rockscape
• Landscape
• Hardscape
 
Shoreline Stabilization
Pacific Avenue
Solana Beach, California

 
The Pacifc Avenue Shoreline Stabilization project was a 37' high and 360' long tieback wall in the city of Solana Beach built under emergency permit conditions to protect the homes on the upper bluff.
 
OUR MISSION
J.C. Baldwin was contacted by TerraCosta Consultants to work with the eight bluff-top homeowners and the City of Solana Beach to construct the wall and perform the backfill operation to shore up the endangered homes. The project consisted of 103, 75' long, 345 kip tieback anchors, 935 cubic yards of 5,000 P.S.I. concrete and keyed 3' into bedrock. The 13,300 square foot wall was rock sculptured and colored to simulate the surrounding bluff.
 
Immediately following the wall construction we proceeded to perform the upper bluff portion of the repair which was a 5,075 cubic yard 1:1 Geogrid reinforced slope. This consisted of over 6,000 square yards of tensar Geogrid embed 3' into a concrete grade beam at the rear of the slope. When the job was completed, the upper and lower bluff repair was nearly invisible to the untrained eye.
 
    next project  
 

JC Baldwin Construction Company
2469 Impala Drive • Carlsbad, CA 92010
760-438-9275  •  fax 760-438-4963

jcbinc@pacbell.net
 
Home  •   About Us  •   Client List  •   Project Profiles  •   Awards  •   In The News  •   FAQs  •   Contact Us